Jan 14, 2025UPD Jan 14, 2025
Jan 14, 2025UPD Jan 14, 2025

https://passivehouse-database.org/index.php?lang=en#d_7551
Our second Passive House has been successfully registered. Location: Hamamatsu.
The details were complex, so the Ψ-value (thermal bridge) calculations were a struggle.
Also, cooling and dehumidification demand was really on the edge — that gave us some sweaty palms.
It took time, but thanks to everyone, we got certification.
Winter in the Chubu region is now almost a no-heating reality. We'd like to find the general-purpose answer for cooling and dehumidification as soon as possible.
We provide calculation outsourcing, design support, and consulting for fellow architects and builders. Thread-based conversation with attachments.
Consult (Professionals) →